Mesyuarat Kedua Penggal Ketiga Dewan Negeri Selangor Tahun 2015
17 Ogos - 20 Ogos 2015
269) GANGGUAN BEKALAN AIR
Tahun: 2015
Sesi: 2
Isu: Infrastruktur & Kemudahan Awam
Adun: Y.B. Tuan Ng Sze Han
Kategori: Mulut
Sub Soalan
-
Nyatakan loji-loji negeri Selangor yang telah dilaporkan mengalami gangguan bekalan air bagi tempoh September 2014 hingga Jun 2015.
Senarai gangguan bekalan air Loji Rawatan Air (LRA) bagi tempoh September 2014 hingga Jun 2015 adalah seperti berikut: dalam Lampiran
LAMPIRAN 1
Gangguan sepanjang Bulan Oktober 2014
Item
Date
Water Treatment Plant Reasons for Shutdown
Period of Shutdown (Hours) 1 01-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak 41.00 2 02-Oct-14 Cheras Bt. 11 Raw water pollution – High ph level
7.00 3 01-Oct-14 Sg. Rumput Raw water pollution – High turbidity 4.08 4 02-Oct-14 Cheras Bt. 11 Raw water pollution – Diesel spillage 7.00 5 03-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak 45.00 6 09-Oct-14 Rantau Panjang
TNB Failure 1.97 7 09-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak
20.00 8
10-Oct-14
Rantau Panjang / SSP1 / SSP2 / SSP3
Raw water pollution – Diesel spillage
12.00
9 11-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak
11.60 10 12-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak 11.25 11 14-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak
17.00 12 12-Oct-14 Ampang Intake Raw water pollution – High turbidity 6.25 13 15-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak
13.00 14 16-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak
15.50 15 17-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak
15.00 16 18-Oct-14 Wangsa Maju Raw water pollution – High turbidity in Sg Gombak
16.42 17 19-Oct-14 Kalumpang Raw water pipe burst at intake 23.25 18 19-Oct-14 Wangsa Maju Raw water pollution – High turbidity
15.33 19 22-Oct-14 Sg. Rumput TNB Failure 6.00 20 22-Oct-14 Ampang Intake Raw water pollution – High turbidity 1.75 Total 290.40 Gangguan sepanjang Bulan November 2014
Item
Date
Water Treatment Plant Reasons for Shutdown
Period of Shutdow n (Hours) 1 18-Nov-14 Ampang Intake TNB Failure 9.00 2 12-Nov-14 Sg. Batu TNB Failure 8.00 Total 17.00 Gangguan sepanjang Bulan Disember 2014
Item
Date
Water Treatment Plant
Reasons for Shutdown
Period of Shutdown (Hours)
1 12-Dec-14 Sg. Tengi TNB Failure 0.83 2 22-Dec-14 Sg. Tengi TNB Failure 3.00 3 23-Dec-14 Sg. Tengi TNB Failure 0.50 4 24-Dec-14 Sg. Tengi TNB Failure 1.75 Total 6.08 Gangguan sepanjang Bulan Januari 2015
Item
Date
Water Treatment Plant Reasons for Shutdown
Period of Shutdown (Hours) 1 14-Jan-15 Sg Batu TNB Failure 8.0 2 15-Jan-15 Sg Langat TNB Failure 9.0 3 20-Jan-15 North Hummock
SYABAS distribution pipe burst
14.00 4 20-Jan-15 Kepong SYABAS distribution pipe burst
19.50 5 22-Jan-15 Sg Tengi TNB Failure 1.33 6 24-Jan-15 BRH TNB Failure 1.00 7 24-Jan-15 Sg Dusun TNB Failure 1.00 8 26-Jan-15 Sg Selisek TNB Failure 0.58 Total 54.41 Gangguan sepanjang Bulan Februari 2015
Item
Date
Water Treatment Plant
Reasons for Shutdown
Period of Shutdown (Hours)
1 20-Feb- 15
Kepong SYABAS distribution pipe burst
19.50 2 20-Feb- 15
BRH TNB Failure 1.00 3 20-Feb- 15
Sg. Dusun TNB Failure 1.00 4 20-Feb- 15
Sg. Selisik TNB Failure 1.00 5 22-Feb- 15
Ampang Intake Raw water pollution – High NTU (1,279 NTU)
0.67 6 23-Feb- 15
BRH TNB Failure 1.00 Total 24.17 Gangguan sepanjang Bulan Mac 2015
Item
Date
Water Treatment Plant
Reasons for Shutdown
Period of Shutdown (Hours)
1
3-Mar-15
Sg. Semenyih
Raw water pollution – High ammonia & manganese level
8.00
2
7-Mar-15
Sg. Semenyih
Raw water pollution – High ammonia & manganese level
5.50
3 18-Mar- 15
Bkt. Tampoi Raw water pollution – High ammonia level > 1.5 ppm
50.00 4 19-Mar- 15
Sg. Semenyih Raw water pollution – High pH level
9.50 5 21-Mar- 15
Sg. Batu TNB Failure 2.18 6 21-Mar- 15
Sg. Rumput TNB Failure 2.50 7 25-Mar- 15
Kepong SYABAS distribution pipe burst
16.75 8 27-Mar- 15
Kepong SYABAS distribution pipe burst
9.75 Total 104.18 Gangguan sepanjang Bulan April 2015
Item
Date
Water Treatment Plant
Reasons for Shutdown
Period of Shutdown (Hours)
1 1-Apr-15 Wangsa Maju Raw water pollution – High NTU (558 NTU)
15.5 2 2- Apr-15 Wangsa Maju Raw water pollution – High NTU (556 NTU)
2.42 3 3-Apr-15 Wangsa Maju Raw water pollution – High NTU (1,420 NTU)
18.75 4 6-Apr-15 North Hummock TNB Failure 1.00 5 6-Apr-15 Bernam Riverheadworks
TNB Failure 0.50 6 6-Apr-15 Sg. Dusun TNB Failure 0.92 7 6-Apr-15 Sg. Selisek TNB Failure 1.00 8 8-Apr-15 Wangsa Maju Raw water pollution – High NTU (648 NTU)
12.00 9 10-Apr- 15
Batang Kali TNB Failure 33.00 10 12-Apr- 15
Batang Kali TNB Failure 3.00 11 12-Apr- 15
Batang Kali TNB Failure 27.83 12 14-Apr- 15
Wangsa Maju Raw water pollution – High NTU (1,840 NTU)
13.00 13 17-Apr- 15
North Hummock Raw water pipe burst 7.00 14 18-Apr- 15
Wangsa Maju Raw water pollution – High NTU (1,892 NTU)
5.00 15 19-Apr- 15
Wangsa Maju Raw water pollution – High NTU (1,710 NTU)
11.50 16 20-Apr- 15
Rantau Panjang Treated water pipe burst 4.00 17 24-Apr- 15
Wangsa Maju Raw water pollution – High NTU (1,090 NTU)
16.50 18 26-Apr- 15
Wangsa Maju Raw water pollution – High NTU (1,260 NTU)
11.00 19 26-Apr- 15
Wangsa Maju Raw water pollution – High NTU (1,134 NTU)
12.50 20 27-Apr- 15
Wangsa Maju Raw water pollution – High NTU (1,517 NTU)
17.50 Item
Date
Water Treatment Plant
Reasons for Shutdown
Period of Shutdown (Hours)
21 29-Apr- 15
Ampang Intake Raw water pollution – High NTU (1,1360 NTU)
1.50 22 30-Apr- 15
Kalumpang Treated water pipe burst 7.50 23 30-Apr- 15
Wangsa Maju Raw water pollution – High NTU (1,517 NTU)
7.33 Total 230.25 Gangguan sepanjang Bulan Mei 2015
Item
Date
Water Treatment Plant
Reasons for Shutdown
Period of Shutdown (Hours)
1 3-May-15 Wangsa Maju Raw water pollution – High NTU (596 NTU)
4.75 2 4-May-15 Wangsa Maju Raw water pollution – High NTU (1,268 NTU)
17.5 3 8-May-15 Wangsa Maju Raw water pollution – High NTU (804 NTU)
7.00 4 10-May- 15
Wangsa Maju Raw water pollution – High NTU (1,450 NTU)
16.00 5 11-May- 15
Wangsa Maju Raw water pollution – High NTU (1,216 NTU)
16.50 6 12-May- 15
Wangsa Maju Raw water pollution – High NTU (1,475 NTU)
20.00 7 14-May- 15
Wangsa Maju Raw water pollution – High NTU (1,020 NTU)
4.00 8 15-May- 15
Bukit Nanas TNB Failure 8.00 9 16-May- 15
Wangsa Maju Raw water pollution – High NTU (1,057 NTU)
12.00 10 17-May- 15
Wangsa Maju Raw water pollution – High NTU (1,810 NTU)
19.83 11 18-May- 15
Wangsa Maju Raw water pollution – High NTU (1,105 NTU)
16.67 12 19-May- 15
Wangsa Maju Raw water pollution – High NTU (1,628 NTU)
17.50 13 21-May- 15
Wangsa Maju Raw water pollution – High NTU (1,324 NTU)
33.00 14 23-May- 15
Wangsa Maju Raw water pollution – High NTU (890 NTU)
4.00 15 25-May- 15
Wangsa Maju Raw water pollution – High NTU (1,586 NTU)
22.50 16 26-May- 15
Wangsa Maju Raw water pollution – High NTU (1,466 NTU)
38.75 Total 258.00 Gangguan sepanjang Bulan Jun 2015
Item
Date
Water Treatment Plant Reasons for Shutdown
Period of Shutdow n (Hours) 1 1-Jun-15 Wangsa Maju Raw water pollution – High NTU (1,865 NTU)
14.50 2
1-Jun-15
Bernam Riverheadwork s
Raw water pump tripped
1.67
3 2-Jun-15 Wangsa Maju Raw water pollution – High NTU (1,428 NTU)
21.50 4 2-Jun-15 Sungai Dusun TNB Failure 4.12 5
2-Jun-15
Bernam Riverheadwork s
TNB Failure
1.00
6 3-Jun-15 Wangsa Maju Raw water pollution – High NTU (1,410 NTU)
18.50 7 6-Jun-15 Wangsa Maju Raw water pollution – High NTU (1,530 NTU)
3.75 8 7-Jun-15 Wangsa Maju Raw water pollution – High NTU (1,560 NTU)
19.75 9 8-Jun-15 Wangsa Maju Raw water pollution – High NTU (1,668 NTU)
43.5 10 8-Jun-15 Ampang Intake Raw water pollution – High NTU (2,390 NTU)
0.75 11 9-Jun-15 North Hummock
SYABAS distribution pipe burst
6.75 12 12-Jun- 15
Cheras Mile II Raw water pollution – Diesel spillage at intake
29.75 13 16-Jun- 15
Rantau Panjang
TNB Failure 6.00 Total 171.54 -
Apakah punca-punca gangguan bekalan air masih kerap berlaku di negeri Selangor?
Punca-punca gangguan bekalan air yang masih kerap berlaku adalah disebabkan :-
- Masalah penurunan paras Kolam Imbangan, Kolam Air dan Kolam Agihan disebabkan permintaan melebihi daripada pengeluaran air bersih
- Paip pecah dan bocor di Loji Rawatan Air dan Sistem Agihan Bekalan Air
- Pencemaran air mentah di Loji Rawatan Air
- Masalah bekalan elektrik (TNB) di Loji Rawatan Air dan Rumah Pam
- Masalah teknikal seperti masalah peralatan mekanikal dan elektrik di Loji Rawatan Air dan Rumah Pam
-
Apakah langkah kerajaan negeri untuk menyelesaikan masalah gangguan bekalan air?
Langkah-langkah yang perlu dilaksanakan :-
- Memastikan rezab bekalan air bersih mencukupi dengan mempercepatkan kerja-kerja penambahan rezab bekalan air seperti pembinaan Loji Langat 2, Projek Mitigasi 2 dan Projek Mitigasi Tambahan. Dalam hal ini, Kerajaan Negeri telah mengambil tindakan seperti berikut:-
- Pelaksanaan Projek Mitigasi 2 yang akan disiapkan sepenuhnya pada Disember 2015 yang akan memberikan penambahan pengeluaran dari loji sedia ada sebanyak 300 JLH;
- Kerajaan Negeri Selangor di dalam Mesyuarat Tindakan Ekonomi Selangor (MTES) bilangan ke 19/2015 yang bersidang pada 30 Julai 2015 telah bersetuju meluluskan permohonan pelaksanaan Projek Loji Rawatan Air Langat 2. Dengan terlaksananya projek Langat 2 ini,
sejumlah 1,130JLH air bersih akan ditambah dalam sistem agihan kepada pengguna.
- Melaksanakan projek membaik pulih loji rawatan air Sungai Langat bagi memastikan loji tersebut boleh beroperasi hingga mencapai pengeluaran 500 JLH dengan adanya sistem standby;
- Dengan persetujuan dari Kementerian Tenaga Teknologi Hijau dan Air (KeTTHA), Kerajaan Negeri akan mendapatkan bekalan air bersih dari Negeri Sembilan sebanyak 65JLH. Kerja-kerja pemasangan paip dari Negeri Sembilan ke Negeri Selangor akan dilaksanakan oleh JBA,
- Kerajaan Negeri Selangor juga telah melantik perunding untuk membuat kajian terperinci mengenai “Water Resources, Supply, Demand And Distribution Study For Selangor” untuk dijadikan sebagai Master plan atau Blueprint bekalan air. Melalui kajian ini kelak, Kerajaan Negeri boleh mengenal pasti sumber-sumber baru untuk kegunaan masa hadapan. Melalui kajian ini juga, Kerajaan Negeri akan dapat mengenalpasti semua sistem agihan yang sedia ada dan boleh merealisasikan matlamat untuk mengujudkan sistem agihan inter connection di mana melalui inter connection ini, sekiranya berlaku henti tugas mana-mana loji, maka ia tidak menjejaskan pembekalan kepada pengguna sebaliknya pembekalan kepada loji yang henti tugas tadi boleh ditampung oleh loji rawatan air yang lain dan Kerajaan Negeri boleh menyediakan masterplan bekalan air untuk tempoh 50 tahun akan datang;
- Kerajaan Negeri Selangor sedang meneliti pembinaan loji-loji baru secara fast track untuk digunakan bagi menampung permintaan pengguna menjelang tahun 2017 dengn anggaran kapasiti sebanyak 350
- Kerajaan Negeri melaksanakan kempen-kempen kesedaran dimulai dengan semua agensi Kerajaan dalam usaha untuk menggunakan air secara jimat dan berhemah dalam usaha untuk menurunkan sekurang-kurangnya 20% penggunaan domestik yang dianggarkan sebanyak 250 liter/orang/hari. Dengan penjimatan ini, dianggarkan sebanyak 880JLH air dapat disimpan menjelang tahun
- Kerajaan Negeri melalui Air Selangor akan melaksanakan penilaian semula ke atas operasi pengagihan dan loji rawatan air sedia ada bagi memastikan operasi pengagihan dan rawatan air di Negeri Selangor adalah mencapai tahap keberkesanan yang unggul. Kerajaan Negeri mensasarkan penurunan NRW pada kadar 2% setiap tahun dan dalam tempoh 5 tahun kadar NRW dapat diturunkan ke tahap minimum 25% di mana jumlah air yang dapat disimpan dianggarkan sebanyak 1,156
- Memastikan sumber bekalan air mentah sentiasa mencukupi untuk pengeluaran air bersih oleh loji-loji rawatan air. Antara cadangan pembangunan sumber air mentah yang sedang diteliti dan dirancang oleh Kerajaan Negeri adalah seperti berikut:
- Pengaktifan kerja-kerja pengepaman kolam-kolam takungan di Bestari Jaya dan Kolam HORAS bagi mengawal pelepasan Empangan Sungai Selangor dan Empangan Sungai Tinggi;
- Meningkatkan paras “Weir” di Sungai Langat dalam usaha untuk mengawal pelepasan air mentah dari Empangan Sungai Langat;
- Dengan persetujuan dari Kementerian Tenaga Teknologi Hijau dan Air (KeTTHA), Kerajaan Negeri akan mendapatkan bekalan air mentah 500 JLH dari Sungai Semantan boleh disalurkan ke Sungai Langat dengan menggunakan fasiliti Penyaluran Air Pahang Selangor yang telah siap sepenuhnya seperti muka sauk, terowong dan rumah pam di Semantan sementara menunggu siapnya Projek Langat 2. Kerajaan Negeri telah menulis kepada Kerajaan Negeri Pahang untuk mendapatkan persetujuan
- Penyaluran Air Mentah Sungai Bernam Fasa 1 dengan kapasiti sebanyak 525 JLH;
- Cadangan Pembangunan ORS Semenyih dengan kapasiti 200JLH
- Pemulihan Sumber Air Mentah Sg Langat Untuk LRA Cheras Bt. 11 Dan Bukit Tampoi dengan kapasiti 58.1 JLH;
- Menambah Kapasiti Takungan Empangan Tasik Subang dengan kapasiti 100 JLH;
- Cadangan Pembangunan Horas 3000 dengan anggaran kapasiti 2000JLH
- Cadangan Pembangunan Sumber Air Klang di mana jumlah kapasiti akan ditetapkan
- Memastikan air mentah di sungai-sungai utama di Negeri Selangor terjaga dari sumber pencemaran. Kerajaan Negeri selangor melalui agensi seperti LUAS, JAS dan PBT mengambil tindakan tegas ke atas mana-mana pihak yang menyumbangkan kepada pencemaran sungai, contohnya, menyita operasi Kilang Genesis yang didapati mencemarkan Sungai Langat dan tindakan mahkamah ke atas Syarikat Muhibah akibat mencemarkan Sungai Gong.
- Melaksanakan kerja penyenggaran berjadual yang beterusan terhadap asset-aset sistem bekalan air serta menaiktaraf sistem bekalan air yang telah usang